Year |
Customer |
Plant(project) |
Q'ty |
Major Spec(Sample Item) |
Remark |
|
2009.7 |
DOOSAN MECATEC/S-OIL |
S-OIL ONSAN REFINERY EXPANSION |
4/4 |
T83 X ID561.2 X TL75 |
SA516-70N(HOT FORMING) |
|
2009.5 |
ILJIN ENERGY |
POLYBED PSA UNIT 632 HMP |
20/20 |
T58 X ID3500 |
SA516-70N (Hot forming) Add.2 |
|
2009.5 |
ILJIN ENERGY |
POLYBED PSA UNIT 632 HMP |
20/20 |
T58 X ID3500 |
SA516-70N (Hot forming) Add.1 |
|
2009.5 |
ILJIN ENERGY |
POLYBED PSA UNIT 632 HMP |
20/20 |
T58 X ID3500 |
SA516-70N (Hot forming) |
|
2009.4 |
TSM TECH / HYUNDAI ENG |
K2 pjt |
2/2 |
T152 X ID2130 |
A516-70N (Hot forming) |
|
2009.3 |
ILJIN ENERGY |
AIR LIQUIDE UOP |
24/24 |
T57 X ID3020 |
SA516-70N (Hot forming) |
|
2009.3 |
SamWhan / Doosan Heavy Ind |
Cirebon Coal Fired Power Plant |
1/1 |
T189 X ID1930 |
A266-2 (Hot forming) |
|
2009.3 |
SamWhan / Doosan Heavy Ind |
Cirebon Coal Fired Power Plant |
1/1 |
T183 X ID1810 |
A266-2 (Hot forming) |
|
2009.2 |
SamWhan / Doosan Heavy Ind |
Cirebon coal fired power plant |
1/1 |
T176 X ID1765 |
A266-2 (Hot forming) |
|
2008.11 |
Doosan Heavy Ind |
Cirebon Coal Power Plant |
6/6 |
T73 X ID650 (Hot forming) |
SA302C (Add.2) |
|
2008.11 |
Doosan Heavy Ind |
Cirebon Coal Power Plant(695 MW) |
6/6 |
T73 X ID650 (Hot forming) |
SA302C (Add.1) |
|
2008.11 |
Doosan Heavy Ind |
Cirebon Coal Power Plant(695 MW) |
6/6 |
T73 X ID650 (Hot forming) |
SA302C |
|
2007.9 |
DAEKYUNG TECHNOS / MITSUI |
HP STEAM DRUM |
6/6 |
T43 * ID1830 |
Hot forming / SA516-70 |
|
2007.9 |
DOOSAN MECATEC / MIGHTY ENGINEERING |
DAC PX Complex |
8/8 |
T83 * ID561.2 |
Hot forming / SA516-70 |
|
2007.4 |
JMC / UOP |
PRODUCT QUALITY PETROLEUM |
14/14 |
T52 * ID2538 |
SA516-70N |
|